Skip to main content
Sydney Waterproofing NSW

NSW contractor licence 260823C

Bathroom and shower waterproofing in Sydney

The membrane under shower, bathroom and laundry tiles, laid to AS 3740:2021 by a licensed waterproofer, and new membranes for showers that leak because the old one has failed.

LICENSED WATERPROOFER ● NSW 260823C ● SINCE 2013 ●
Finished look
Our workMembrane complete on the floor and up the walls, before the screed and tiles
  • Done to AS 3740:2021
  • Bond breakers at every junction
  • Flood tested before the tiles go on

Get a free quote

Bathroom and shower waterproofing

Add photos if you can. We usually reply within one business day.

NSW contractor licence 260823C

Optional, up to 5 photos0/5 photos added

Our service

What we check and seal

  • A sound, flush substrate

    The slab or sheeting is clean, dust-free and free of hollows, with gaps around the hob and sheet joints made flush before any product goes on (Housing Provisions 10.2.22).

  • Bond breakers at every junction

    Wall-to-wall, wall-to-floor and hob junctions get a bond breaker matched to the membrane’s flexibility class, so it moves with the building instead of tearing (10.2.27).

  • The waste and penetrations sealed

    The membrane is finished into the drainage flange at the waste and sealed around taps, the rose and any niche: the points where most shower leaks start.

  • Full height and full coverage

    Across the floor, at least 1800 mm up the shower walls, over the hob and onto the floor beyond it, or down to the waterstop at a hobless shower.

  • Cured before the tiles go on

    Each coat cures for the time the manufacturer sets before the next one, and before the bed and tiles are laid over it.

Signs

How to tell what a leaking shower needs

Where and when the water shows usually points to the cause, and only one of the causes is a grout problem.

Not sure? Send photos for a quote
  1. Dark or cracked grout and silicone

    Water is getting into the joints, but the membrane may still be stopping it. If there’s no damp outside the shower, new grout and silicone from a tiler may be all it needs; we don’t regrout or reseal as a job by itself.

  2. Swelling or stains outside the shower

    Skirting, door jambs or a vanity base that swell next to the shower usually mean water is travelling under the tiles past the edge of the membrane, often at the hob or a wall junction.

  3. A stain on the ceiling below

    Water reaching the room underneath has got through the membrane, or around the waste where the membrane should seal into the puddle flange. Regrouting won’t stop it.

  4. Damp only when one tap runs

    If a wall gets wet only when a particular tap or the rose is on, the leak may be in the pipework or a tap seal. That’s a job for a licensed plumber first.

  5. Hollow-sounding tiles

    Tiles that sound drummy when tapped have lost their bond, often because water has been sitting in the bed beneath them for a long time.

The build-up

The membrane under the tiles

A tiled shower floor on a concrete slab, with the membrane under the mortar bed.

Diagram: Concrete slab or fibre-cement sheet, Primer, Bond breaker at junctions, Puddle flange at the waste, Liquid membrane, Mortar bed laid to falls, Tile adhesive, Tiles and grout, from the bottom up, separated to show the order they go down12345678
  1. The finished surface: it sheds water but isn’t the waterproofing.

  2. Bonds the tiles to the bed and the walls.

  3. Shapes the floor to fall to the waste at between 1:80 and 1:50.

  4. Applied in coats over the floor and at least 1800 mm up the shower walls.

  5. The membrane finishes into it, so water in the bed still reaches the drain.

  6. Lets the membrane flex across wall and floor joints.

  7. Seals the surface so the membrane bonds evenly.

  8. Cleaned, made flush and checked before anything is applied.

Diagram of a typical job, not to scale. Select a layer to see what it does.

Bathroom coated in grey membrane, with white bond breaker along every wall and floor junction

Our work, annotated

The same layers on one of our bathrooms, before the screed went down

  1. 3Bond breaker along every wall and floor junction
  2. 4Puddle flange at the shower waste
  3. 5Liquid membrane over the floor and up the walls

Numbers match the diagram above.

Step by step

How a bathroom job fits with the other trades

  1. 1

    Photos and a quote

    Send photos or plans of the bathroom. We usually reply with a written quote within one business day.

  2. 2

    Plumbing roughed in

    Your plumber sets the waste, taps and rose first, so the membrane seals around them instead of being cut later.

  3. 3

    Checked, then membraned

    We check the slab or sheeting, the hob and the falls. Then the primer, bond breakers, flange detail and membrane coats go on, each left to cure.

  4. 4

    Flood test and certificate

    We flood test the membrane before it’s covered and give you a waterproofing certificate for the job.

  5. 5

    Ready for the tiler

    We tell you or your tiler when the membrane is ready for the bed and tiles. From then on, nothing should be cut or screwed through it.

Typical prices

What bathroom and shower waterproofing typically costs

Typical Sydney prices, so you know the range before you send photos.

  • Waterproofing a bathroom in a renovation

    $600–$1,200Per job, including GST

    What’s included

    Covers: Primer, bond breakers, the waste detail and the membrane across the floor and up the shower walls, with the tiles already off.

    Not included: strip-out, screed and tiling.

  • Re-waterproofing a leaking shower

    $2,500–$6,500Per job, including GST

    What’s included

    Covers: The whole job: tiles, bed and failed membrane out of the shower recess, a new membrane, and the recess retiled by a licensed tiler.

Size, access, what’s under the tiles and the finish all move the price. Your written quote, made from photos or a visit, is the price.

What moves the price: our cost guide
LICENSED WATERPROOFER ● NSW 260823C ● SINCE 2013 ●

Why choose us

Licensed, insured and backed in writing

A licensed waterproofer who does the job once and does it properly, with the insurance, paperwork and warranty to back it.

Check licence 260823C on the NSW register
  • Licence 260823C

    NSW Waterproofing Technician since 2013, current to 10 July 2028.

  • $20m insured

    Public liability cover on every job, big or small.

  • Statutory warranties

    On home building work in NSW: six years for major defects, two for others.

  • Tested before it’s covered

    Showers, bathrooms, balconies and flat roofs flood tested, with a waterproofing certificate.

Job photos

Our work on this service

Photos from our own jobs.

  • Shower area in grey membrane with white bond breaker lines at the floor junctions
    The shower end of a renovation, with the junctions detailed before the membrane
  • Renovated bathroom with exposed ceiling framing and bond breaker lines across the floor
    A bathroom renovation stripped back to the frame and sheeted, with bond breaker on the floor joints
  • Bathroom with membrane on the walls and primed floor sheets with bond breaker tape on the joints
    Walls coated, floor primed and taped at the joints, ready for the floor membrane
  • Bathroom with blue membrane on the walls and a glossy floor membrane falling to a shower set-down
    Floor membrane over the set-down for the shower

Reviews

What customers say

Shown word for word, straight from Google.

Google

Absolutely amazing work, really nice team and super flexible, our bathroom looks amazing 👏

Luke Cassin

Read it on Google

Before you book

Details and questions

Still not sure?

Send a few photos of the job and the answer comes back with your free written quote.

Send photos for a quoteCall 0451 662 300

More about this work

The membrane is the waterproof layer under the tiles. Tiles shed most of the water, but grout is porous, so in a shower it’s the membrane that stops water reaching the slab, sheeting or timber underneath. It can’t be inspected or patched once the tiles are down, so it has to be right before they go down.

You need it whenever a bathroom, ensuite or laundry is renovated back to the slab or frame, and when a shower leaks because the original membrane has failed or was never continuous. For a shower, the NCC Housing Provisions require a waterproof floor, including any hob or step-down. The walls must be waterproof to at least 1800 mm, and wall junctions for at least 40 mm either side.

The main choice is where the membrane sits: under the mortar bed, or on top of a screed already laid to falls. The Housing Provisions allow either (10.2.21). We choose based on the floor, the waste position and the tiles, and agree it with you or your builder before work starts.

When the membrane has failed

When the membrane itself has failed, the lasting fix is to remove the tiles and bed in the shower area, let the substrate dry, and lay a new membrane before the tiles go back. Clear sealers and grout coatings can slow water through the joints for a while, but they aren’t a membrane and don’t repair one.

Laundries

The NCC asks less of a laundry than a shower. The floor and the wall-to-floor junctions need to be water resistant. Where a tub is within 75 mm of a wall, the wall needs to be water resistant to at least 150 mm above the tub (Housing Provisions 10.2.5).

That’s the minimum. In an upstairs laundry, or a unit with a neighbour underneath, a burst washing machine hose ends up in someone’s ceiling. So many owners have the whole floor membraned, with an upturn at the walls and the doorway. If a floor waste is fitted, the floor has to fall to it at between 1:80 and 1:50.

Does a laundry need waterproofing in NSW?

Kitchens

The NCC doesn’t count a kitchen as a wet area, so a kitchen floor doesn’t need a membrane the way a shower does. What usually prompts kitchen waterproofing is what’s underneath: a timber subfloor, or someone else’s living room. There, a leaking dishwasher or sink waste can do damage long before anyone sees it.

For those floors the membrane runs across the whole kitchen under the tile bed and turns up at the walls and the line of the cabinets. It is sealed around the plumbing for the sink and dishwasher.

Do I need a licensed waterproofer for a bathroom in NSW?

Yes, if the work is worth more than $5,000 in labour and materials, including GST: it needs a contractor licence that covers it. Ours is NSW contractor licence 260823C, with the Waterproofing Technician class since 2013. You can look it up on the NSW Government licence register before you call us.

Can a leaking shower be fixed without removing the tiles?

Only when the water is getting in through worn grout or silicone and the membrane underneath is still sound. That is regrouting work for a tiler, which we don’t take on by itself. If water is reaching the room below or the wall outside the shower, the membrane has failed or was never sealed at the waste or hob. The tiles in the shower area then have to come up, and we lay a new membrane.

Why do two bathroom quotes differ so much?

Usually because they cover different work. Check whether strip-out, screed and the waste are included, how far the membrane goes (the shower only or the whole floor), the number of coats and whether there’s a flood test. Compare the written scope, not just the total.

Can I have a walk-in or hobless shower?

Yes. Without a hob or step-down, a waterstop at the edge of the shower area holds the water back. Under a screen it sits at least 5 mm above the finished floor. With no screen it sits flush with the floor, at least 1500 mm from the shower rose. The floor still falls to the waste at 1:80 to 1:50, and the walls are waterproofed to at least 1800 mm (Housing Provisions 10.2.12 to 10.2.18).

What are the waterproofing rules for walk-in and hobless showers?

Can a new membrane go over the old one in a renovation?

Not as a rule. A new membrane has to bond to a clean, sound surface, and an old membrane that has failed is neither. In a renovation the old bed and membrane come out with the tiles.

How long before the tiler can start?

Usually three to four days after we start: two to three days for the membrane coats to go on and cure, then a flood test that usually runs for 24 hours. It depends on the product, the number of coats and the weather: cold, damp days slow curing down. We follow the manufacturer’s cure times and let you or your tiler know when it’s ready.