What are the waterproofing rules for walk-in and hobless showers?

LICENSED WATERPROOFER ● NSW 260823C ● SINCE 2013 ●
Finished look
Our workShower recess and floor coated in liquid membrane
Reading time
7 min
Published
3 November 2026
By Sydney Waterproofing NSW
Licence 260823C

Our bathroom and shower waterproofing page covers the work itself.

Walk-in shower rules at a glance

ShowerWhat the code asks
Every showerA floor waste, with the floor falling to it at 1:80 to 1:50. A waterproof floor. Walls waterproof to at least 1800 mm.
Hobless, with a screenA waterstop under the screen line, finishing at least 5 mm above the finished floor
Walk-in, no screenA flush waterstop at least 1500 mm from the shower rose, or the whole floor waterproofed and drained
Step-downShower floor at least 25 mm below the floor outside it
Timber or particleboard floorThe whole bathroom floor waterproof

These are the National Construction Code (NCC) rules for houses. States can change the code, so we read them as they apply in NSW.

What counts as a walk-in, hobless or level-entry shower?

The terms overlap. A hobless or level-entry shower has no raised kerb, so the shower and bathroom floors meet at about the same level. A walk-in shower usually has no door either, only a fixed panel or no screen.

The code sorts showers by whether a screen encloses them, and by how the edge is formed: a hob, a step-down or a level threshold.

What does every shower need?

A walk-in shower needs all of these, exactly like a shower with a hob:

  • A floor waste, with the floor falling to it.
  • A waterproof floor across the whole shower area.
  • Waterproof walls to at least 1800 mm high.
  • Sealed joins and pipes: the joins between walls, the wall and floor join, and every pipe and tap through the walls or floor.

A ready-made (preformed) shower base does the job of the floor membrane. The walls, joins, pipes and taps still need the same treatment.

What fall does a shower floor need?

Between 1:80 and 1:50, all the way to the floor waste. That is a drop of 12.5 mm to 20 mm per metre. Too flat, and water sits or runs out of the shower. Too steep, and the floor is awkward underfoot.

In a walk-in shower, the falls do the job of a hob. So they are set out before the membrane goes on, not fixed later with the tiles.

The code doesn't set the type of grate. A round waste or a linear strip drain both work, if the floor falls to it and the membrane is sealed into it.

What is different about a shower with a screen and no hob?

A waterstop is fixed under the screen line. It must finish at least 5 mm above the finished floor, with every joint and wall junction waterproof. The membrane runs up and over it, so water under the tiles is held back at the screen.

The tiles on each side sit at almost the same height, so the falls have to be right. If the floor falls the wrong way, or too gently, water runs out under the screen.

Does a walk-in shower need a screen?

No. The code allows an open shower with no screen, but it asks more of the floor around it. You have two options:

  • A flush waterstop at least 1500 mm from the shower rose, level with the top of the floor and with waterproof joints. Everything inside that line counts as the shower area.
  • The whole wet area floor waterproofed and drained to a floor waste, as if the whole bathroom were the shower.

The 1500 mm is measured across the floor. In a small bathroom, the shower area often takes in most of the floor anyway.

Can you have a step-down instead?

Yes. A step-down shower floor sits at least 25 mm below the floor outside it. The step does the job of a hob, but it is not level entry. It usually needs a recessed slab or lowered subfloor, which is easiest in a new build or full renovation.

Bathroom with blue membrane on the walls and a glossy floor membrane falling to a shower set-down
Our work: floor membrane over the set-down for the shower

What about a timber floor?

If the floor is timber, plywood or particleboard, the whole bathroom floor must be waterproof. For a walk-in shower that is usually simpler anyway. The membrane covers the whole floor, runs up the walls at every junction and takes in the waterstop.

Timber moves more than a concrete slab. So the bond breakers, which let the membrane flex at every junction, matter even more. A hob cannot be made of timber.

Are the walk-in shower regulations changing?

NSW uses NCC 2022 Amendment 2 now and will adopt NCC 2025 on 1 May 2027. A shower built before then is built to the current rules. If your job runs close to that date, ask your certifier or waterproofer which edition applies.

What goes wrong with walk-in showers?

Most problems trace back to the edge and the falls:

  • Falls too flat, or falling towards the bathroom, so water runs out of the shower.
  • No waterstop, or one set too low, so water under the tiles escapes under the screen line.
  • The membrane not sealed to the waterstop, or waterstop joints left open at the wall.
  • The membrane stopping short of 1800 mm on the walls, or not running up behind the screen line.
  • The membrane not sealed into the waste, so water runs under it at the drain.

All of these are buried under tiles within days. That is why the membrane is best checked, and flood tested, before tiling. Our guide to waterproofing certificates explains the flood test and what the certificate should record.

Does a walk-in shower cost more to waterproof?

Usually. The waterstop, falls and membrane at the threshold take more time than a shower with a hob. A new linear or strip drain can add plumbing work. Our cost guide gives typical prices for a bathroom membrane and a leaking shower, and what moves them.

What this means for you

Decide the shower layout, the screen and the drain before the floor is prepared. The falls and the waterstop depend on them.

Renovating? Send us a photo of the bathroom, a sketch or plan of the new layout, and whether the floor is concrete or timber. Use our enquiry form, or call 0451 662 300. Our standards guide covers the rest of the wet-area rules.

Code clauses for builders and certifiers

Where the rules sit

The rules are in NCC 2022 Amendment 2, ABCB Housing Provisions Part 10.2 (wet area waterproofing). NSW adopts NCC 2025 on 1 May 2027.

Clause by clause

  • 10.2.14: showers are grouped as enclosed or unenclosed, and by how the edge of the shower area is formed (hob, step-down or level threshold).
  • 10.2.2, 10.2.14 and 10.2.25: every shower needs a floor waste, a waterproof floor across the shower area, walls and junctions, and waterproof penetrations.
  • Walls: waterproof to at least 1800 mm above the floor substrate, with the membrane taken up the wall to at least 1800 mm above the finished tile level.
  • Junctions: wall junctions waterproof for at least 40 mm either side; the wall and floor junction and every penetration through the shower walls or floor waterproof.
  • 10.2.12: floor falls continuous to the floor waste, no less than 1:80 and no more than 1:50. The same falls apply to any other floor waste in the room. The grate type is not specified.
  • 10.2.17: enclosed shower without a hob or step-down. The waterstop's vertical leg finishes at least 5 mm above the finished floor where a screen is installed. Waterstop/wall junctions and joints are waterproof.
  • 10.2.18: unenclosed shower. Either a waterstop at least 1500 mm from the shower rose, its vertical leg finishing flush with the top of the floor, with junctions and joints waterproof; or the whole wet area floor waterproofed and drained to a floor waste.
  • 10.2.15: step-down at least 25 mm below the floor outside the shower.
  • 10.2.16: a hob cannot be timber.
  • 10.2.3: timber, plywood or particleboard floor: the whole floor of the room waterproof.
  • 10.2.24: a waterstop at the bathroom doorway finishes flush with the top of the floor; where the whole floor is waterproofed, the floor membrane is sealed to it.
Sources (2)
  1. 1.ABCB Housing Provisions, Part 10.2: wet area waterproofing (checked 3 November 2026)
  2. 2.NSW Government: NSW to adopt new National Construction Code (checked 3 November 2026)